Implementation of mechanized tunnels and ancillary structures of Isfahan Urban Train Line 2 (with 2 TBMs) from Shahrak Imam Hussein (AS) Station to Imam Ali (AS) Station
Implementation of mechanized twin tunnels and ancillary structures of Isfahan Urban Train Line 2 from Shahrak Imam Hussein (AS) Station to Imam Ali (AS) Station, each with a length of 7116 meters (excluding the length of the stations), with a total length of the two tunnels of 14232 meters and an internal diameter of the tunnel of 6.890 meters, including overhaul operations and restarting of two TBMs from the entrance shaft (V2) located at the entrance of Imam Hussein (AS) Town to the N2 station located in Imam Ali (AS) Square, and construction of route drains and supply shafts, crossovers and cross passages.