Constraction of D9 Flow-through Dam

– Earth dam and pebble dike with total volume 500,000 m3
– Evacuation conduits including two 1200 mm lines total length 400 meter
– Spillways and other concrete structures with total volume of 6000 m3
– Water conveyance channel with total length of 1200 m
– Construction of permanent access road to the project