OK
SABIR INTERNATIONAL
  • 1st Floor, No.3, 2nd alley, Golestan St. South of

    VANAK PARK, Hemmat Express Way,Tehran-Iran

    تهران - بزرگراه همت، جنوب ونک پارک

    خیابان گلستان، کوی 12متری دوم، پلاک3، واحد اول

  • Call Us On
    تماس با ما

    (+98 21) 88 03 97 46

  • Mail Us
    ایمیل

    Info@Sabirinternational.com

Construction of Mechanized Tunnel of Southern Extension of Tehran Metro Line 6 (Dowlatabad- Rey) with TBM Machine and 4 Stations

Project description

Design and study, supplying material and construction of supporting structure and main structure, plaster works and mechanical and electrical installation of A6-1, A6-2, A6-3, A6-4 stations, construction of interconnecting tunnels and emergency exits between A6 and A6-1 stations, construction of mechanized tunnel with TBM, inner diameter is 9,20 meter and tunnel is 5.5 km long. Track laying and flooring between A6 station and night parking. And construction of TBM exit shaft in the form of EPC contract.

Client

Tehran Urban & Suburban Railway Operation Co

Employer’s consultant

Behro consulting & engineering Co.

Contractor

Sabir International Company

sabir