OK
SABIR INTERNATIONAL
  • No. 24 , corner of west 66th alley , end of Golestan St.

    South of Vanak park, Hemmat Express Way,Tehran-Iran

    تهران - بزرگراه همت، جنوب ونک پارک

    انتهای خیابان گلستان،نبش کوچه66 غربی،پلاک24

  • Call Us On
    تماس با ما

    (+98 21) 88 03 97 46

  • Mail Us
    ایمیل

    Info@Sabirinternational.com

Construction of Mechanized Tunnels and Related Structures of Line 2 of Isfahan Metro - between Imam Hossein station and Imam Ali station

Project description

construction of mechanized tunnels and related structures of line 2 of Isfahan metro, between Imam Hossein station and Imam Ali station, each tunnel is 7116 meters long (regardless of length of stations) The length of the two tunnels is 14232 meters in total and inner diameter of tunnels is 6,890 meters. This project includes overhaul and launching TBM, starting from entrance shaft (V2) located at Imam Hossein district, and construction of route drains and crossovers and cross passages.

Client

Isfahan urban and suburban railway Co

Employer’s consultant

Zayand Ab consulting engineering Co .
Farbar consulting engineering Co.

Contractor

Sabir International Company