OK
SABIR INTERNATIONAL
  • 1st Floor, No.3, 2nd alley, Golestan St. South of

    VANAK PARK, Hemmat Express Way,Tehran-Iran

    تهران - بزرگراه همت، جنوب ونک پارک

    خیابان گلستان، کوی 12متری دوم، پلاک3، واحد اول

  • Call Us On
    تماس با ما

    (+98 21) 88 03 97 46

  • Mail Us
    ایمیل

    Info@Sabirinternational.com

Flood collection network in a 2000 hectares area in Persian gulf mining and metal industry region

Project description

Execution of three canals and related structures according to specifications of executive drawings as follows:
- CC-1 concrete canal with rectangular section and 3235 meter length, 5 meter width, 2 meter height. The canal has 4 concrete culverts with two 2.35*2.30 openings. The lengths of culverts are 26, 29, 42, 33 meter.
- CC-2 concrete canal with rectangular section and 1910 meter length, 3 meter width, 2 meter height. The canal has 1concrete culvert with one 2*1.35 opening. The length of culvert is 60 meter.
- CC-3 concrete canal with rectangular section and 2985 meter length, 1.20 meter width, 1.20 meter height

Client

Persian Gulf special region of steel and mineral industries

Consultant

Rah shahr consulting engineering Co

Contractor

Sabir International Company